- August 30, 2024
OUR Two (2) Day Hybrid Installation Process is Client-Centric
WE PUT THE CLIENT FIRST, NOT THE COMPANY!
Meaning, Epoxy-King does NOT rush our jobs, scrambling to get in and out to make a quick dollar. One (1) day installation often causes many mistakes and at times complete installation failures.
We apply our materials as per manufacturers recommendations.
First we install a Industrial Epoxy Base-coat and then a Clear Polyaspartic Topcoat. This method combines the benefits of both materials: the thickness and durability of industrial epoxy with the quick curing and UV resistance of polyaspartic finishes.
Here’s a detailed step-by-step process of how we achieve this:
STEP 1: SURFACE PREPARATION: DAY 1 — Epoxy King will Diamond Grind your entire garage floor using our 250lb. PG 450 Husqvarna Floor Grinder and Husqvarna Hep Vacuum removing all oil, grease, and dirt. Next, we will repair and fill in cracks and chips with a concrete repair compound. Make sure the surface is level and smooth.